How do I change the order of the CB user Profile Tabs?
I know how to change the name of Tabs and which registration fields go into each Tab.
Must I move the location of the fields into the Tab I want or is there a way to change the order of the Tabs.
e.g.
I want to move the Contact Info Tab to the back.
Post edited by: krileon, at: 2010/05/14 21:02